Douala · Cameroon · Serving Central & West AfricaEnglish / Français · Corporate & industrial advisory
ISO 45001 · CLAUSE 6.1.2

ISO 45001 Clause 6.1.2: Hazard identification and risk assessment

Ten common weaknesses in hazard identification and risk assessment—and practical ways to make workplace controls more reliable.

What this means in practice

Hazard identification is not a one-time register exercise. ISO 45001 clause 6.1.2 expects organizations to determine hazards and assess OH&S risks with a process that reflects routine and non-routine work, people who may be affected and changes in the operation. Weaknesses often include copying generic hazards, overlooking contractor interfaces, treating risk scores as controls, failing to revisit assessments after change and not testing whether actions work in practice. A stronger method names the activity, credible hazard and exposure, existing barriers, additional action, owner and review trigger. Teams should involve people who understand the work and keep the assessment current when equipment, work conditions or organization change.

Ten weaknesses to look for in a workplace risk assessment

Use these questions to review the quality of an assessment, not merely whether a form has been completed. Clause 6.1.2 covers hazard identification and the assessment of OH&S risks and other risks; the applicable text of the standard remains the reference.

  1. Generic hazard lists: walk through actual tasks, equipment and exposures instead of copying another site’s register.
  2. Missing non-routine work: include maintenance, cleaning, start-up, shutdown and foreseeable abnormal situations.
  3. Overlooked people: consider employees, contractors, visitors and others who may be affected, including differing capabilities.
  4. Weak worker participation: involve people who carry out the work and can explain workarounds and constraints.
  5. Risk scores treated as controls: a numerical rating does not itself prevent an event or reduce exposure.
  6. Reliance on instructions and PPE alone: examine elimination, substitution and engineering options before relying on administrative measures.
  7. Contractor interfaces left unclear: identify who controls isolations, access, simultaneous activities and handovers.
  8. Changes not reassessed: revisit findings when equipment, substances, staffing, work methods or conditions change.
  9. Lessons from incidents ignored: include near misses, relevant incidents and evidence of control failures.
  10. Actions without follow-up: assign responsibility and review dates, then check that the action works in practice.

Turn the assessment into an operational control plan

For each significant scenario, record the activity, people exposed, credible event, existing controls, further action, owner and review trigger. Select controls in proportion to the risk and make responsibilities clear at the point of work.

For example, a vehicle–pedestrian interface should lead to a review of segregation, crossing points, visibility and traffic arrangements—not simply a lower residual-risk score on a spreadsheet. This is an illustrative example, not a report of a client project.

Apply the method to your operating context

Ports, industrial sites and mobile teams in Cameroon and the wider region face different interfaces. Start with the specific activity and applicable requirements. Maximum Services supports hazard identification, assessment workshops and follow-up planning in English and French; the engagement scope is agreed with the organisation.

References

Related expertise: ISO & Management Systems, Maritime & Port Advisory.